OPWC Grant

UPDATE!!!   This project is complete as of 11/2019!!  Enjoy the new sidewalk and road!!

The city is using the Ohio Public Works Commission Grant for a project involving the resurfacing and improvement on Arch St. west of Delano Ave. continuing to N. Woodbridge Ave. ending at Western Ave. 

Included in the project is a sidewalk with curb and gutter, catch basins, new guardrail and grading.  The existing box culvert at the curve connecting Arch St. with N. Woodbridge Ave. is to be removed, replaced and extended in length.  Arch St., N. Woodbridge Ave. and Annis Court will be repaved with some sections requiring full depth pavement repair.

Native Construction will be the head contractor on the job and it is scheduled to begin in July 2019 and is scheduled to last about a month.  There will be road closures when the culvert is being placed.  Please see our Facebook page for updates!